Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Descrition:Black Anodized Industrial Aluminum Profiles , Aluminum Profile for Cylinder
1 | Business type: | Real Big Manufacturer & Exporter with 22 years experience |
2 | Production Standard: | Architecture Profile : GB 5237-2008 |
Industry Profile : GB/T6892-2008 | ||
3 | Main products | Aluminum extrusion profiles for architectural & industrial,Different aluminum profile sections for different applications . |
Aluminum Formwork for Building Construction. | ||
4 | Main Product Finishes | Mill finish,powder coating,anodized color,wooden pattern,Polyvinylidene Fluoride (PVDF)-Coating,Machine Polishing, Chemical Polishing, Mirror Polishing, Brushing Finish,thermal insulation of barrier strip,thermal insulation of filling-polyurethane |
5 | Price: | Based on Guangdong Nanhai Lingtong Aluminium Ingot price +different finishes processing Fee + local cost |
6 | Payment term: | T/T, L/C at sight |
7 | Specification: | A. Alloy: 6063, 6060, 6061, 6005 etc |
B. State: T5/T6 | ||
C. Length: 1m-13 m ( polishing : 2.5 m ) | ||
D. Normal Anodizing thickness: 8-12 micro | ||
E. Normal powder coating thickness: 60-100 micro | ||
F. Tensile strength: ≥ 16 mpa | ||
G. Yield strength: ≥ 110 mpa | ||
H. Extensibility: ≥ 8% | ||
I. Hardness(HW): ≥ 8 | ||
8 | Packing: | Kraft paper, EPE Fram, Shrink film, Carton Box,Wooden box etc,Customized package is available. |
9 | MOQ: | 1X20 FCL ,Each profile not less than 500 kgs. Each color not less than 2 tons. |
10 | Sample time | 10-15 days after drawing confirmed and mold cost paid. |
11 | Delivery time: | 35 days after deposit received. |
12 | Port | Shanghai Port |
Order,payment,terms,shipment
1, Minimum order: 500kg per trial order 1 piece of sample free of charge provided by approval and kept for future mass production.
2, Sample Lead Time: 25 working days(15 days for making the tool and 10 days making the samples. Before sending the samples to customer, samples should pass strict test in our lab. ) Production Lead time: it depends on customers' order quantity ( 30 working days after deposit).
3, Payment: (Can negotiate with customers, our usual practices are as follow)
4, Tooling:100% prepaid by T/T.
5, Parts:30% upon order confirmation and balance before delivery by T/T
Applications:
Mainly used for industrial production , such as automation equipment , enclosure of the skeleton and the companies according to their own customized mold machinery and equipment , such as assembly line conveyor , hoist, dispenser, testing equipment, shelves , etc., electronic machinery industries and clean room with a gain majority.
Competitive Advantage:
Hentec Industry Co.,Ltd. [China (Mainland)]
Business Type:Manufacturer
City: Wuxi
Province/State: Jiangsu
Country/Region: China (Mainland)